.
Putnam Village
of
Wallingford Valley


Copyright © 2024 PutnamVillage.com All Rights Reserved


What is the Top Level Installation Plan &  Benefits?


Why it is in the best interest of Putnam residents that Electric Car Charging Stations (ECCS) be allowed to be installed in Putnam Village?


First off, there has to be a plan that residents want to support.  Here is a top-level installation plan that I believe 2/3’s of the residents would agree on.


  • For the maximum convenience for residents, the ECCS would be located at the requesting resident’s reserved parking spot.

  • The requesting resident would own the ECCS and be responsible for all costs associated with the installation, liable for any damages that result from the installation, all costs for maintenance and repair of the station and for all costs for the electricity consumed.  The Station would be connected into his/hers basement electrical panel and would include an on/off switch to prevent unauthorized use.

  • With the resident bearing all costs associated with the ECCS installation, there would only be a minimal one-year impact on the Putnam Budget and our monthly condo fees. Those one-time start-up costs would be required to fund an Engineering Company contract to provide an “Installation Requirements” document and some legal fees required to amend the “Declaration” as well as a legal document that a resident would have to sign stipulating his/her responsibilities. All total, I’d realistically estimate that these one-time start-up costs would be around $5000 and these costs would necessarily have to be shared by all residents. In an overall yearly budget these costs are less than 1% of the budget and would only impact one year's budget.

  • The comprehensive “Installation Requirements” document would be given to any resident requesting the installation of an ECCS at his/her reserved parking spot and would include all Federal, State, Township, Council and legal requirements. With that information, the resident would be able to shop around for the installation contractor of his/her choice.

What are the benefits of allowing ECCS installations for all of our residents?

    • It gives residents more flexibility in the type of car they can buy.

    • Increases the desirability and value of Putnam Village Townhouses

    • Increases the pool of homebuyers that may want to live in Putnam Village and have or want to buy an electric car.

    • Increases the value of a home with an installed charging station

    • Is congruent with the national trend toward reducing Green House emissions.

  • I'm open for comments and suggestions about this plan at Info@PutnamVillage.com

  • Walter Antkiewicz